Posted at 09-06-2012
The paper machine in Papellera del Centro Navalcarnero will be dismantled and transferred to India for company Balkrishna. The scope of works consists in the PM itself and part of stock preparation. The main challenges of the project will be the dismantling of the Yankee Cylinder. It will be descended in the basement of the building. We have to dig a hole of about 1.20 meters in the ground. The bottom of the hole will be leveled with a 20 cm concrete slab.Afterwards the Yankee will be moved out sideways through the wall opening.
The second task is the lifting of the fiber pulper. It is about 20 meter long and 3.5 meter high. We will build a special stand for it and will be lifted with two cranes. For both Yankee and Pulper we have ordere two flat rack trailers.

News and galleries related to this project: 7

End of project - Papelera del Centro Navalcarnero, Spain

End of project - Papelera del Centro Navalcarnero, Spain

Posted at 31-10-2012
At the end of our job in Spain, we would like to show you some more pics and impressions of the now-empty building. Various openings caused by the removal, were closed up by us. The building has been cleaned. And finally, the openings that will have been required for disassembly, again sealed. The company ...
Read more
Gas Power plant dismantling - Papelera del Centro - Navalcarnero, Spain

Gas Power plant dismantling - Papelera del Centro - Navalcarnero, Spain

Posted at 30-10-2012
In order to finish the dismantling of the Gas power plant, we had to remove the steam boiler.
This boiler was especially challenging because we were not allowed to dismantle the roof of the building. The boiler had to be transported laterally out of the building. After precise planning and consideration ...
Read more
Dismantling of an 80 tons Steam boiler

Dismantling of an 80 tons Steam boiler

Posted at 22-10-2012
As you can see in our news section, we had to dismantle a gas power plant at Papelera del Centro in Navalcarnero, Spain. The removal of an 80 tons steam boiler was a real challenge...
Read more
Dismantling in Madrid Spain comes to an end

Dismantling in Madrid Spain comes to an end

Posted at 05-09-2012
This week, the company Margiz, dismantled a 45-ton Yankee. This cylinder was on the first floor of factory building and could not be removed through the roof. For this reason, a special hydraulic jack scaffold was transported from Germany to Spain. Furthermore, in the basement area of the building we ...
Read more
Fiber Pulper and Yankee Cylinder - dismantling and transport preparation

Fiber Pulper and Yankee Cylinder - dismantling and transport preparation

Posted at 04-09-2012
The biggest challenges in the Papellere del Centro project was the dismantling, packing and loading of two special items: The Yankee Cylinder and the Fiber Pulper.

The Yankee was liften from its frame with a hydraulic lifting system, then descended to the level 0 of the machine (basement). An excavator ...
Read more
Paper factory dismantling in Madrid

Paper factory dismantling in Madrid

Posted at 21-08-2012
On 30th of April our company will start the dismantling of a paper production factory in Madrid, Spain. Our estimated duration of work will be four months. We will need about 240 containers for transport. We plan few over-sized transports - like transport of a 19 m long flow pulper. We also plan the packing ...
Read more
Dismantling of paper factory near Madrid - Papelera Del Centro

Dismantling of paper factory near Madrid - Papelera Del Centro

Posted at 07-07-2012
In June 2017 we begin a new project in Navalcarnero, Spain. Papellera de Centro, the paper mill near Madrid will be transferred to India. We planned around 250 containers. and two special transports for the Fiber pulper and the Yankee Cylinder.
Read more


Our work


We are a German-Polish Company, our main objective is innovative dismantling and assembly of equipment and production lines. Matchmarking, dismantling, loading and shipping, of materialand finally re-... Read more

Our team


Our team consists of highly skilled workers: mechanics, electricians, electronic technicians, welders. From dismantling to re-erection, all project phases are handled and carefully documented for our Customer. Read more

Our tools


For every task we provide the best solution! Forklifts, cranes and special lifting equipment, tools for dismantling and overhauling, MARGIZ can provide and handle. Our own specific software used for m.... Read more